Upper Mt Gravatt East State School Rebuild for Fleetwood
On Friday night there was a devastating fire at Upper Mount Gravatt East State School. East Coast Cranes supplied a 100T Crane for an emergency recovery and within 48 hours we were able to install 2 x Prep Classrooms, 3 x Year 2 Classrooms, 2 x Year 3 Classrooms and 1 x Year 4 Classroom. This has been our biggest and quickest recovery and we are very proud to have assisted Fleetwood Australia with this rebuild to allow the children to be back at school the following Tuesday.
by David Hopper | July 11, 2019 | Projects
Our LTM1220-5.2 Liebherr Crane installing a 34t switchroom at Moolabin Sub Station for Schneider Electric. It was an early start with a small window of time to get through the rail corridor and onto the QR Sub station pad, with only hundreds of millimeters to spare and a tight time schedule the boys delivered with pin point accuracy – Yet another fantastic install for Schneider, QR Rail and East Coast Cranes.
by David Hopper | 27 Septemeber 2019 | Projects
Our 25t Franna commencing work for WOHS at the Cross River Rail site, this project will run for 7 years and consist of many new rails, new tunnels and new stations.
by David Hopper | July 11, 2019 | Projects
Our 220t Liebherr Crane dual lifting trains at Qube Logistics, these trains were originally Queensland Rail trains and were then shipped to South Africa for use and are now back in Brisbane for repairs and refurbishment to continue their life in Queensland.
Dual Lifting A 28T Drill Rig on Pointcorp Development Site
Dual Lifting A 28T Drill Rig on Pointcorp Development Site East Coast Cranes 100T Liebherr dual lifted a 28T drill rig with the tower crane onsite on the Pointcorp Development site at New Farm for our client McPhersons Excavations - check out the cool drone footage of...
Putting Together A Telco Tower for Hijsen
Putting Together A Telco Tower for Hijsen Check out these awesome drone pictures of our Liebherr 100T Slew Crane putting together a telco tower for our customer Hijsen. Our 25T franna was also onsite to assist due to the tricky set up - it helped walk counterweights...
20 Mod School Building Installation for Fleetwood
20 Mod School Building Installation for Fleetwood Today we are onsite at Pimpama State Primary College, installing a 20 Mod school building for our client Fleetwood. Thank you Superior Crane Hire for supplying a Grove GMK5150 150T Mobile Slew Crane with 44T of...
39 Tonne Roller Lifts for Qube
39 Tonne Roller Lifts for Qube Check out this massive 39 tonne roller we lifted for QUBE last week! Using our Liebherr 100T Slew Crane with 28.2T of counterweight, our operator Lee and riggers Kenny and Geordie were able to lift this heavy roller into place. If...
Lifting 22M Roof Sheets, 50M Radius For The Tweed Heads Shopping Centre Upgrade
Lifting 22M Roof Sheets, 50M Radius For The Tweed Heads Shopping Centre Upgrade This week we used our Liebherr 100T Slew Crane to lift 22M roof sheets up onto the Tweed Heads Shopping Centre at a 50M radius. To get the reach, we had to bring along our fly and needle,...
Loading Out An Antonov Aircraft for Edge Heavy Logistics
Loading An Antonov Last Friday night we used our 100T Liebherr with 28.2T of counterweight to load up a 25T heat exchanger and a 20T fryer onto a huge Antonov aircraft bound for Russia. This massive cargo plane is capable of transporting 200T! Check out some of the...
Four Mod Building Install for Ausco Modular
Four Mod Building Install for Ausco Modular Today we helped Ausco Modular install a four mod building onto the school oval at Broadbeach State School. Alex & Chris "Bangas" used our Leibherr LTM1080/1 80T crane with 16T of counterweight to lift the building...
Tower Crane Setup for Falcon Cranes at the Sable On Palm Site, Palm Beach
Tower Crane Setup For Falcon Cranes at the Sable On Palm Site This weekend we helped Falcon Cranes set up their Potain MR90 tower crane at the Sable On Palm site, at Palm Beach. Kurt and Kenny took our "Leibherr LTM 1100-4.2" 100T mobile crane with 28.2T of...